Fine tuning the operation of the restoration trial structures at Glenshera Swamp, Stipiturus CP
Posted on 29 Oct 2017 at 09:57h
in News, Fleurieu Peninsula Swamps, Glenshera Swamp restoration, Wetland Restoration 0 Comments
While at Glenshera Swamp for a couple of days in late September, we were able to see precisely how responsive an already wet catchment above the swamp is to small amounts of rainfall – with 8.5 mm of rain falling overnight on the 24th of September. So after...